LibrePlan Changelog

What's new in LibrePlan 1.4.0

Apr 30, 2013
  • This version adds several improvements and new features, and all the fixes developed since version 1.3.3.
  • The most important changes include an integrated connector to import JIRA issues, a Timesheets loader from TimEnterprise, an importer of Microsoft Project and Planner, user-configurable filtering options, extended information on the resources' load availability and overtime, and Chinese language support.

New in LibrePlan 1.3.3 (Dec 22, 2012)

  • Performance improvements on the project listing window (specially when working with a lot of projects), and on the project creation and WBS manipulation.
  • We have changed the internals of the custom JavaScript files inside LibrePlan, to avoid some problems due to the caching of those files, and creating issues that forced manual cache refresh when upgrading LibrePlan installations.
  • An informative message has been added to the installation package to suggest Java configuration tunning, in order to avoid Memory problems.
  • The visibility of the projects on the company view has been modified, to show by default all projects but CANCELED and STORED.

New in LibrePlan 1.3.2 (Dec 3, 2012)

  • This minor version includes all the fixes done since the previous version and some new features which have been developed lately.
  • It also includes some of the tasks done during the first LibrePlan Hackfest arranged in A Coruña on the 8th of November.
  • Highlights are: improvements in the "Project Status" report, planning adjustment according to timesheets, a new DELETE operation in the order elements Web service, new bound resources Web service operations, and minor bugfixes.

New in LibrePlan 1.3.0 (Jul 27, 2012)

  • After some delay, the LibrePlan team is proud to announce the release of a new major version, 1.3.
  • The main features which come with this version are resource binding to users, monthly timesheets, a project dashboard, expenses, permission enhancements, currency support, work breakdown structure (WBS) setting up behavior, outsourcing improvements, concurrent usage improvements, a revamped menu, more languages supported, and timesheet search window enhancements.

New in LibrePlan 1.2.3 (Apr 21, 2012)

  • This version added a money-based cost monitoring system, Polish translation, and other minor enhancements.
  • Database synchronization issues which appeared when changing planning points in the WBS were fixed.
  • Default users -user, wsreader, and wswriter- are now disabled by default.
  • A problem where task duration was not being refreshed properly when doing an allocation and you needed to apply the allocation twice was fixed.
  • A START_IN_FIXED_DATE constraint that caused the project duration to be incorrectly calculated in company view was fixed.